10 September 2012 Kalininskaya NPP
2007 — 2011 Renovation of Unit 4 2010 — 2012 Power distribution facilities of Unit 4
Complexity category
Transformer capacity
Over 100 leading Russian and international producers of energy equipment (ABB, Alstom, Siemens, Elektrozavod, ZETO, ZTR)
Unique installations, including Russian 750/500 kV ATs, which feature the highest capacity of all the autotransformers operating in the country
Over 40 subcontractors
Two contruction phases
1000 workers with expertise in more than 19 areas
Kalininskaya Nuclear Power Plant is located in the Udomelsky region of Russia’s Tver Oblast, providing power to all of the country’s central regions.
In order to complete the Unit 4 renovation project, CE hired specialist personnel. The effort was carried out as part of the Federal Targeted Programme "Development of the Russian Atomic Energy Complex 2007—2010 and to 2015".
The work necessitated the purchase of the unique 146-m KROLL-K10000 tower crane with two arms and a load capacity of 240t, which dramatically reduced the construction times.
Construction, installation, repairs and renovation of the reactor and related facilities (reactor shell, containment building).
Construction and installation of the unit’s precomissioning facilities (cooling circuit, cooling towers and related pumping station, closed discharge channel, non-essential turbine water supply pipelines, production facilities outside the construction site).
The 750 kV OPL between Kalininskaya NPP and Gribovo serves the Tver Oblast and the Moscow Oblast in the Central Federal Okrug.
The Belozerskaya 750 kV substation serves the Vladimir Oblast in the Northwestern Okrug.
The 500 kV OPL between Gribovo and Dorokhovo along with the 500 kV substation in Dorokhovo serves the Moscow Oblast in the Central Federal Okrug.
The 220 kV cable and OP line between Dorokhovo and Sloboda serves the Moscow Oblast in the Central Federal Okrug.
VVER-1000 unit type
Producers of energy equipment
Complexity category
Year of launch
2007 — 2011 Renovation of Unit 4 2010 — 2012 Power distribution facilities of Unit 4
Construction of the 750 kV
255 km OPL with the 750 kV substation Gribovo
Construction of the 500kV
73 km OPL with the 500 kV substation Dorokhovo
Construction of the 220 kV
82.4 km cable and OPL between Dorokhovo and Sloboda
Substation works
750 kV Belozerskaya
The project was completed in 2012