8 April 2019 Interchange in Krasnogorsk
2016 — Ongoing
Total project length
Daily traffic capacity
2018 Interchange in Krasnogorsk
A flyover over the Riga rail
A flyover at the exit from Volokolamsk Motorway to Ilyinsk Motorway.
A bridge over the Banka River
A U-turn overpass at Volokolamsk Motorway
Three pedestrian crossings
Construction of treatment facilities of the transport hub, which will provide treatment of wastewater from the roads.
Renovation of the Banka River bridge
Straightening the Banka River course, including the installation of three culverts
Construction of gabions, meshes and stones for reinforcement purposes
Lanes from Volokolamsk Motorway
Lanes from Penyaginsk Motorway
Lanes from Ilyinsk Motorway
Renovation of Volokolamsk Motorway and service roads
Greenscaping
Greenscaping
2016 — Ongoing
December 2015
Contract is signed to build the first pre-comissioning complex of a two-level interchange
March 2016
Governor of the Moscow Oblast Andrei Vorobyov launches the construction of the interchange
July 2017
Building the second and third pre-commissioning complex of the Krasnogorsk interchange
Late 2018
Flyover over the Riga Rail of the Volokolamsk Motorway completed, traffic launched. Utility lines reconfigured, the Banka River course straightened
July 2019
Traffic launched at several exit ramps. Drivers can access the Ilyinsk Motorway via an exit ramp from the Volokolamsk Motorway in the direction towards Moscow
The interchange is expected to be completed by late 2019